ir a principal | Ir a lateral
  • Blog
  • phoTOs
  • TOwdc
  • mailTO

protocity

L System Presentation 2





giovedì 17 luglio 2008 |

0 commenti:

Posta un commento

Post più recente Post più vecchio Home page
Iscriviti a: Commenti sul post (Atom)

///Prototyping the city_Teaching Staff

Leaders: C.Pasquero - Architectural Association M.Poletto - Architectural Association C.Tiazzoldi - Columbia University Local coordination: C. Griffa - Politecnico di Torino Local Partners: Denaldi Legnami s.a.s. Experts: P. Anzalone – Columbia University Assistants: D. del Giudice - A. Graziano

///Links

  • Torino world design capital
  • Politecnico di Torino
  • GSAPP Columbia University
  • AAschool
  • denaldi
  • studiogriffa
  • cau08
  • ecologicstudio
  • aainter10
  • Tiazzoldi
  • nlsu
  • DigitAG&
  • apiusurface
  • madeincalifornia

///Groups

  • Group 1
  • Group 2
  • Group 3
  • Group 4
  • Group 5
  • Group 6

///Stats

Statcounter

///Archives

  • ▼  2008 (59)
    • ►  agosto (4)
    • ▼  luglio (55)
      • Prototyping the city_final pavilion.
      • Pavilion under construction.
      • Workshop in Sicily.
      • Groups presentation.
      • Final review.
      • Nessun titolo
      • Turin world capital design_Interactive_People
      • Interact key words conceptual maps on web!
      • work in progress
      • 22_7 Wood Technology And Material System
      • 19_07 presentation
      • ws_ pollenzo
      • 21_07 scale test models
      • Summer school party.
      • before midterm review.
      • Review with Denaldi.
      • 19_7 Wood Technology And Material System
      • 19_7 UrbanFields presentation
      • 19_7 ecologic cycles and material experiment
      • 1st week wip02
      • 1st week wip01
      • Summer School Party.
      • L System Presentation 2
      • L System Presentation 1
      • IMPORTANT_material for the press release
      • important
      • 15_7 ecologic cycles and material experiment
      • 16_7 ecologic cycles and material experiment
      • 16_7 Wood Technology And Material System
      • 2nd day
      • Case study.
      • 1st day.
      • Configuration zero: stuff
      • Investigation on the opportunities given from the ...
      • torino world design capital font
      • group 03 program presentation
      • 14_7 Urban fields
      • 14_7 Wood Technology And Material System
      • Group posting.
      • Registration day.
      • Configuration zero realized.
      • Denaldi legnami s.a.s. at work.
      • configuration ZERO infopoint.
      • Abstract_Prototyping the city
      • Configuration ZERO_wip
      • General scenario.
      • Configuration ZERO
      • Parametric logic.
      • Group n.1: stuff
      • Local Partners: Denaldi Legnami s.a.s.
      • Student groups.
      • Students.
      • Turin map.
      • Images test.
      • Hello World!

Layout design MIC | credits BINARYBONSAI | All Rights reserved | Torino World Design Capital 2008